Language
New   -  New Tutorial Examples    - GEOTEC Office 9.2 Service Pack 1.0         - GEOTEC Office under Windows Vista        - GEOTEC Software: proud sponsor of the 12th international conference of IACMAG
  Search    Home Downloads What's new Feedback Contact us
GEOTEC Office
 

  ELPLA
  - Description
  - Calculation methods
  - Boundary conditions
  - Geometry and Loads
  - Piles
  - Soil
  - Design of the slab
  - Graphical drawing
  - Drawing sections
  - Tabulating data and results
  - Typical applications
  - New features
  - Tutorial
  - Verification Examples
  - Practical Examples
  - Reinforced Concrete Design Examples
 

  BOHR
 

  TIEF
 

  GeoTools
 

  Self-Adaptive Mesh Wizard
  

   GEOTEC-Editor

- ELPLA> Verification Examples>

Example 6: Consolidation settlement under a rectangular raft

Example 6: Consolidation settlement under a rectangular raft

Description of the problem

To verify the consolidation settlement calculated by ELPLA, the final consolidation settlement of a clay layer under a rectangular raft calculated by Graig (1978) (Example 7.2, page 186) is compared with that obtained by ELPLA.

A building is supported on a raft 45 [m] * 30 [m] is considered. The contact pressure is assumed to be uniformly distributed and equal to q = 125 [kN/m2]. The soil profile is as shown in Figure 6. The coefficient of volume change for the clay is mv = 0.35 [m /MN].

 It is required to determine the final settlement under the center of the raft due to consolidation of the clay.

 