Language
New   -  Workshop, Analysis of raft and piled raft by the program ELPLA At the university Siegen in Germany on Wednesday 11 November 2009 New   -  New Tutorial Examples    - GEOTEC Office 9.2 Service Pack 1.0        
  Search    Home Downloads What's new Feedback Contact us
GEOTEC Office
 

  ELPLA
  - Description
  - Calculation methods
  - Boundary conditions
  - Geometry and Loads
  - Piles
  - Soil
  - Design of the slab
  - Graphical drawing
  - Drawing sections
  - Tabulating data and results
  - Typical applications
  - New features
  - Tutorial
  - Verification Examples
  - Practical Examples
  - Reinforced Concrete Design Examples
 

  BOHR
 

  TIEF
 

  GeoTools
 

  Self-Adaptive Mesh Wizard
  

   GEOTEC-Editor

2.11   Undo and Redo of commands

It's possible to undo and redo all commands in ELPLA-Data when defining a project. As you create the project, you may wish to undo the effects of a selected command and return to a previous state, Figure B-14. 


Figure B-14   Undo and redo the commands when defining FE-Net

Home page link 2  Enhancements in version ELPLA 9.0

GEOTEC Software   Feedback   Contact us    

Copyright © GEOTEC Software All rights reserved.

Privacy policy